Water Right Report : 98-8054( License/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner KOOTENAI TRIBE OF IDAHO PO BOX 1269 BONNERS FERRY ID 83805-1269

Water Right Status

Priority Date : 8/20/2021
Basis : License
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
KOOTENAI RIVER COLUMBIA RIVER
MOYIE RIVER KOOTENAI RIVER
GROUND WATER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
MOYIE RIVER 62N 02E 15 0 NW SE BOUNDARY
GROUND WATER 62N 02E 15 0 SW SE BOUNDARY
GROUND WATER 62N 02E 15 0 SW SE BOUNDARY
KOOTENAI RIVER 62N 02E 22 0 NW NE BOUNDARY

Water Uses

Beneficial Use From To Diversion Rate Volume
FISH PROPAGATION 01/01 12/31 1.17 CFS 768.00 AFA
TOTAL 1.17 CFS 768.00 AFA

Places of Use

Place of Use Legal Description : FISH PROPAGATION (BOUNDARY county)
Township Range Section Lot QQQ QQ Q Acres
62N 02E 15 NW SE
62N 02E 15 SW SE

Conditions

Code Condtions
X15 A fish screen of 1/4 inch or smaller mesh shall be installed and maintained at the points of diversion from the Kootenai and Moyie Rivers.
F06 The following rights are diverted through point(s) of diversion described above: 98-7913 & 98-8054.
027 Use of water under this right shall be non-consumptive.
122 The right holder shall not divert water at a rate exceeding what is reasonably necessary for the beneficial use authorized by this right.
01M After specific notification by the Department, the right holder shall install a suitable measuring device or shall enter into an agreement with the Department to use power records to determine the amount of water diverted and shall annually report the information to the Department.
X35 Rights 98-7913 and 98-8054 when combined shall not exceed a total diversion rate of 5.02 cfs, a total annual maximum diversion volume of 768 af for fish propagation uses.
004 This right does not grant any right-of-way or easement across the land of another.
Dates
  • Licensed Date : 2/3/2025
  • Decreed Date :
  • Permit Proof Due Date : 10/1/2022
  • Permit Proof Made Date : 9/16/2022
  • Permit Approved Date : 9/28/2021
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date: 8/20/2021
  • Protest Deadline Date: 9/20/2021
Other Information
  • State or Federal : S
  • Water District Number : TBD
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Combined Acre Limit :
  • Combined Volume Limit: 768.00
  • Combined Rate Limit: 5.02
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False