Water Right Report : 97-9034( License/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner ADAMS IRREVOCABLE TRUST DTD 804 S EMERSON ST DENVER CO 80209-4343

Water Right Status

Priority Date : 12/24/2022
Basis : License
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
PRIEST LAKE PRIEST RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
PRIEST LAKE 62N 04W 15 0 NE SE BONNER

Water Uses

Beneficial Use From To Diversion Rate Volume
IRRIGATION 04/01 10/31 0.02 CFS 1.50 AFA
FIRE PROTECTION 01/01 12/31 0.02 CFS
TOTAL 0.02 CFS

Places of Use

Place of Use Legal Description : FIRE PROTECTION (BONNER county)
Township Range Section Lot QQQ QQ Q Acres
62N 04W 15 NE SE
62N 04W 15 1 NE SE
62N 04W 15 1 SE SE
Place of Use Legal Description : IRRIGATION (BONNER county)
Township Range Section Lot QQQ QQ Q Acres
62N 04W 15 1 NE SE 0.1
62N 04W 15 1 SE SE 0.4
Irrigation Totals
Total Acres Acre Limit
0.50

Conditions

Code Condtions
077 Water shall not be diverted for fire protection use under this right except to fight or repel an existing fire.
X31 This right when combined with all other rights shall provide no more than 0.02 cfs nor more than 1.5 afa at the field headgate for irrigation of the place of use.
227 Water shall not be diverted under this right when flows in the Priest River are below minimum flow amounts as defined by Right 97-7380. The right holder shall be responsible for monitoring the daily flow of the Priest River using real-time data and shall cease diverting water when flows in the Priest River are below established minimum flow amounts. Unless otherwise specified by the Director of the Department of Water Resources, data from the U.S. Geological Survey Priest River Gauging Station, No. 12395000, may be used for purposes of determining the daily flow amounts.
X60 Place of use is located within Lot B; Canoe Point Family Estates Subdivision.
Dates
  • Licensed Date : 4/25/2025
  • Decreed Date :
  • Permit Proof Due Date : 2/1/2024
  • Permit Proof Made Date : 3/8/2024
  • Permit Approved Date : 1/23/2023
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date: 6/30/2022
  • Protest Deadline Date: 1/9/2023
Other Information
  • State or Federal :
  • Water District Number : TBD
  • Generic Max Rate Per Acre : 0.03
  • Generic Max Volume Per Acre : 3
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False