Priority Date : 6/5/2009
Basis : License
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
UNNAMED STREAM
LAKE PEND OREILLE
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
UNNAMED STREAM
57N
01W
34
0
NE
NE
BONNER
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
POWER STORAGE
01/01
12/31
8.60 AFA
POWER FROM STORAGE
01/01
12/31
5.00 AFA
TOTAL
8.60 AFA
Places of Use
Place of Use Legal Description : POWER STORAGE (BONNER county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
57N
01W
34
NE
NE
Place of Use Legal Description : POWER FROM STORAGE (BONNER county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
57N
01W
34
NE
NE
Conditions
Code
Condtions
004
This right does not grant any right-of-way or easement across the land of another.
027
Use of water under this right shall be non-consumptive.
025
This right does not constitute Idaho Public Utilities Commission or Federal Energy Regulatory Commission approval that may be required.
R23
The water right confirmed in this license for hydropower purposes shall be junior and subordinate to all rights to the use of water, other than hydropower, within the State of Idaho that are initiated later in time than the priority of this license and shall not give rise to any right or claim against any future rights to the use of water, other than hydropower, within the State of Idaho initiated later in time than the priority of this license.
916
The term of this right shall extend toDecember 31, 2034. Prior to the expiration of the term, the Director may issue an order canceling all or any part of the use authorized herein, may establish a new term, or may revise, delete, or add conditions under which the right may be exercised. The order shall take effect on the date the current term expires. If the director does not issue such an order, the term shall automatically extend to a length equal to the project's prior term and any prior conditions on the water right shall remain in effect.
219
Right 96-9438 authorizes the diversion of 1 acre-foot for the initial fill of the pond and 3.6 acre-feet for seepage and evaporation, and up to 4 acre-feet for additional refills of the pond for the power from storage use for a total volume of 8.6 acre-feet.