Water Right Report : 96-8730( License/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner STATE OF IDAHO IDAHO WATER RESOURCE BOARD CYNTHIA BRIDGE CLARK PO BOX 83720 BOISE ID 83720-0098

Water Right Status

Priority Date : 6/15/1992
Basis : License
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
PEND OREILLE RIVER COLUMBIA RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
PEND OREILLE RIVER Beginning of Stream Flow 56N 05W 29 0 NW NW BONNER
PEND OREILLE RIVER Ending of Stream Flow 56N 06W 13 0 NW SW BONNER
PEND OREILLE RIVER Ending of Stream Flow 56N 06W 13 0 SW SW BONNER
PEND OREILLE RIVER Ending of Stream Flow 56N 06W 24 0 NW NW BONNER
PEND OREILLE RIVER Ending of Stream Flow 56N 06W 24 0 SW NW BONNER
PEND OREILLE RIVER Ending of Stream Flow 56N 06W 24 0 NW SW BONNER

Water Uses

Beneficial Use From To Diversion Rate Volume
MINIMUM STREAM FLOW 1/01 12/31 10655.00 CFS
TOTAL 10655.00 CFS

Places of Use

Conditions

Code Condtions
027 Use of water under this right shall be non-consumptive.
Establishment of a minimum flow on the Pend Oreille River in the requested reach shall serve to protect water released from Albeni Falls Dam as it flows through the requested reach at rates up to the established flow, but shall not directly or indirectly cause any change in the operation of Albeni Falls Dam. Upon the future finding and order of the Director that gaging stations are required to maintain the approved minimum stream flow, the right holder shall permanently install and maintain gaging stations as specified by the department. The Director retains jurisdiction, as described below, to review and amend any and all parameters of this right. The Board, upon receiving a request, or upon its own initiative, may petition the Director for an amendment to the right. The petition must set forth any significant change in circumstances and evidence of the public interest supporting the proposed amendment. The Director will notify the general public and specific persons or known interested parties of the proposed change, and conduct a hearing for the purpose of determining whether the right should be amended in the public interest. The burden of proof at the hearing shall be upon the persons or parties seeking the amendment to establish that the amendment of the right would be in the public interest. This minimum stream flow begins at Albeni Falls Dam in the NWNW, S29, T56N, R5W and ends 2.4 miles downstream at the state line on the west side of Sections 13 and 24, T56N, R6W. This minimum stream flow is for the protection of fish and wildlife habitat, aquatic life and recreational values.
Dates
  • Licensed Date : 2/19/1999
  • Decreed Date :
  • Permit Proof Due Date : 10/1/2002
  • Permit Proof Made Date : 8/31/1998
  • Permit Approved Date : 12/11/1997
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date: 6/15/1992
  • Protest Deadline Date:
Other Information
  • State or Federal :
  • Water District Number : NWD
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False