Water Right Report : 95-4507-B ( Decreed/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Attorney BROMLEY, CHRIS M C/O MCHUGH BROMLEY PLLC PO BOX 107 BOISE ID 83701-0107
Current Owner RIVERSTONE MASTER ASSOC 1579 W RIVERSTONE DR COEUR D ALENE ID 83814-1013

Water Right Status

Priority Date : 3/15/1954
Basis : Decreed
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
SPOKANE RIVER COLUMBIA RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
SPOKANE RIVER 50N 04W 10 4 NE SE KOOTENAI

Water Uses

Beneficial Use From To Diversion Rate Volume
IRRIGATION 03/15 11/15 0.43 CFS
TOTAL 0.43 CFS

Places of Use

Place of Use Legal Description : IRRIGATION (KOOTENAI county)
Township Range Section Lot QQQ QQ Q Acres
50N 04W 10 SE NE 9.0
50N 04W 10 4 NE SE 1.0
50N 04W 11 7 SW NW 10.0
50N 04W 11 8 NW SW 2.0
Irrigation Totals
Total Acres Acre Limit
22.00

Conditions

Code Condtions
C18 This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
P40 This claim was renumbered from former claim 95-4507.
This water right was claimed with an accomplished transfer for the place of use under Section 42-1425, Idaho Code. There is insufficient information to confirm an accomplished change in place of use occurred prior to January 1, 2006. This right has been recommended with the elements of the water right that were confirmed to exist prior to January 1, 2006.

Water Supply Bank

Lease Type: Contract

Lease ID: 2209
Lease Status: Active
Lease Start Date: 1/1/2026
Lease End Date: 12/31/2030

Beneficial Use Div Rate Leased Div Volume Leased Acre Limit Leased Total Acres Leased
Irrigation 0.43 22.00 22.00
Dates
  • Licensed Date :
  • Decreed Date : 11/8/2019
  • Permit Proof Due Date :
  • Permit Proof Made Date :
  • Permit Approved Date :
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date:
  • Protest Deadline Date:
Other Information
  • State or Federal :
  • Water District Number : TBD
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False