Water Right Report : 95-17890( License/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner BLACK ROCK UTILITIES INC PO BOX 1764 COEUR D ALENE ID 83816-1764
Representative HAYNES, ROBERT G 2571 S REYNOLDS RD COEUR D ALENE ID 83814-7965

Water Right Status

Priority Date : 9/13/2019
Basis : License
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
COEUR D ALENE LAKE SPOKANE RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
COEUR D ALENE LAKE 48N 04W 16 1 NW NE KOOTENAI

Water Uses

Beneficial Use From To Diversion Rate Volume
MUNICIPAL STORAGE 01/01 12/31 38.20 AFA
MUNICIPAL FROM STORAGE 03/15 11/15 33.10 AFA
DIVERSION TO STORAGE 01/01 12/31 2.50 CFS
TOTAL 2.50 CFS 38.20 AFA

Places of Use

This water right has a Large Place Of Use

Conditions

Code Condtions
F06 The following rights are diverted through point of diversion described above: 95-9045 and 95-17890.
The right holder shall maintain an impermeable liner in the pond to eliminate seepage losses.
219 Right 95-17890 authorizes a total annual storage volume of 38.2 acre-feet, 33.7 acre-feet to be used for the initial filling or carryover storage of the reservoir and 4.5 acre-feet for the replacement of losses caused by evaporation.
X35 Rights 95-9045 and 95-17890 when combined shall not exceed a total diversion rate of 2.5 cfs and a total annual maximum diversion volume of 1,215.0 af.
126 Place of use is within the service area of Black Rock Utilities Inc. The place of use is generally located within Section 4-5, 8-9, and 16-17, Township 48N, Range 04W and Section 33, Township 49N, Range 04W.
180 A map generally depicting the service area for this water right at the time of this approval is attached to this document for illustrative purposes.
004 This right does not grant any right-of-way or easement across the land of another.
Dates
  • Licensed Date : 8/7/2026
  • Decreed Date :
  • Permit Proof Due Date : 1/1/2025
  • Permit Proof Made Date : 1/22/2025
  • Permit Approved Date : 12/16/2019
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date: 8/23/2019
  • Protest Deadline Date: 11/25/2019
Other Information
  • State or Federal : S
  • Water District Number : NWD
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Combined Acre Limit :
  • Combined Volume Limit: 1215.00
  • Combined Rate Limit: 2.50
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False