Water Right Report : 92-10033( License/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner MOREHOUSE, BRUCE C PO BOX 509 SAINT MARIES ID 83861

Water Right Status

Priority Date : 10/7/2008
Basis : License
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
CARLIN CREEK ST MARIES RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
CARLIN CREEK 45N 02W 20 0 SW NW BENEWAH

Water Uses

Beneficial Use From To Diversion Rate Volume
POWER 04/01 11/30 0.18 CFS 87.10 AFA
TOTAL 0.18 CFS 87.10 AFA

Places of Use

Place of Use Legal Description : POWER (BENEWAH county)
Township Range Section Lot QQQ QQ Q Acres
45N 02W 20 SE NW

Conditions

Code Condtions
025 This right does not constitute Idaho Public Utilities Commission or Federal Energy Regulatory Commission approval that may be required.
08A This right is subject to the provisions of Sections 42-205 through 42-210, Idaho Code, restricting the sale, transfer, assignment, or mortgage of this right. Failure to comply with these provisions is cause for immediate cancellation of this right.
004 This right does not grant any right-of-way or easement across the land of another.
The right holder shall allow 0.5 cfs of water to flow in the channel of Carlin Creek past the point of diversion at all times. Each year, when flow conditions allow, the right holder shall install a weir type measuing device that will ensure 0.5 cfs remains in Carlin Creek at the point of diversion.
17M The Director retains jurisdiction of this right in order to limit the use of water for hydropower generation purposes to a specific term of years as required by Section 42-203B(7), Idaho Code.
X15 A fish screen of 3/32 inch or smaller mesh shall be installed and maintained at the point of diversion.
027 Use of water under this right shall be non-consumptive.
R22 The rights for the use of water confirmed in this license shall be junior and subordinate to all rights for the use of water other than hydropower, within the State of Idaho that are initiated later in time than the priority of this right and shall not give rise to any right or claim against any future rights for the use of water, other than hydropower, within the State of Idaho initiated later in time than the priority of this right.
X16 The approach velocity at the point of diversion shall not exceed 0.4 feet per second.
Dates
  • Licensed Date : 12/7/2011
  • Decreed Date :
  • Permit Proof Due Date : 6/1/2012
  • Permit Proof Made Date : 10/25/2010
  • Permit Approved Date : 6/2/2009
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date: 10/7/2008
  • Protest Deadline Date: 11/3/2008
Other Information
  • State or Federal :
  • Water District Number : NWD
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False