Water Right Report : 91-7122( Decreed/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner STATE OF IDAHO IDAHO WATER RESOURCE BOARD CYNTHIA BRIDGE CLARK PO BOX 83720 BOISE ID 83720-0098

Water Right Status

Priority Date : 6/15/1992
Basis : Decreed
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
ST JOE RIVER COEUR D ALENE LAKE

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
ST JOE RIVER Beginning of Stream Flow 45N 03E 13 6 SE NE NW SHOSHONE
ST JOE RIVER Ending of Stream Flow 46N 02W 23 0 SE NE SW BENEWAH

Water Uses

Beneficial Use From To Diversion Rate Volume
MINIMUM STREAM FLOW 08/01 10/31 470.00 CFS
MINIMUM STREAM FLOW 11/01 07/31 941.00 CFS
TOTAL 941.00 CFS

Places of Use

Conditions

Code Condtions
C18 This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
092 Upon future finding and order of the director that gaging stations are required to maintain the approved minimum stream flow, the right holder shall permanently install and maintain gaging stations as specified by the department.
This minimum stream flow is for the protection of fish and wildlife habitat, aquatic life and recreational values.
027 Use of water under this right shall be non-consumptive.
This minimum stream flow begins at the confluence of the St. Joe River with Marble Creek in T45N, R03E, S13, SENENW (Lot 6) and ends 36 miles downstream at the confluence of the St. Joe River with the St. Maries River in T46N, R02W, S23, SENESW.
The Idaho Water Resource Board, upon receiving a request, or upon its own initiative, may petition the Director for an amendment to this water right. The petition must set forth any significant change in circumstances and evidence of the public interest supporting the proposed amendment. The Director will notify the general public and specific persons or notify interested parties of the proposed change, and conduct a hearing for the purpose of determining whether the right should be amended in the public interest. The burden of proof at the hearing shall be upon the person or parties seeking the amendment to establish that the amendment of the right would be in the public interest.
Dates
  • Licensed Date :
  • Decreed Date : 11/13/2015
  • Permit Proof Due Date : 10/1/2002
  • Permit Proof Made Date : 8/31/1998
  • Permit Approved Date : 12/11/1997
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date: 6/15/1992
  • Protest Deadline Date:
Other Information
  • State or Federal :
  • Water District Number : NWD
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False