Priority Date : 5/30/1884
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
LEMHI RIVER
SALMON RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
LEMHI RIVER
20N
23E
10
0
NW
NE
LEMHI
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
3/15
11/15
0.10 CFS
TOTAL
0.10 CFS
Places of Use
Place of Use Legal Description : IRRIGATION (LEMHI county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
20N
23E
10
NW
NE
3.2
Irrigation Totals
Total Acres
Acre Limit
3.20
Conditions
Code
Condtions
C18
This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
030
A separate stream alteration permit from the IDWR is required for any activity in the stream channel other than construction and/or maintenance of the diversion structure. If the proposed construction or operation involves construction of an outfall or any other work in the stream channel other than a water diversion, the right holder shall contact the Department and obtain a Stream Channel Alteration permit prior to the start of construction.
R02
A lockable device subject to the approval of the Department shall be maintained on the diverting works in a manner that will provide the watermaster suitable control of the diversion.