Priority Date : 3/1/1871
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
LEMHI RIVER
SALMON RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
LEMHI RIVER
20N
23E
3
0
SE
NW
LEMHI
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/01
11/01
0.05 CFS
TOTAL
0.05 CFS
Places of Use
Place of Use Legal Description : IRRIGATION (LEMHI county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
20N
23E
3
4
NW
NW
1.5
Irrigation Totals
Total Acres
Acre Limit
1.50
1.50
Conditions
Code
Condtions
S40
The use of water for irrigation under this right may begin as early as March 15 and may continue to as late as November 15, provided other elements of the right are not exceeded. The use of water before April 1 and after November 1 under this remark is subordinate to all water rights having no subordinated early or late irrigation use and a priority date earlier than the date a partial decree is entered for this right.
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 74.
R43
The right holder shall maintain a measuring device and lockable controlling works of a type approved by the Department in a manner that will provide the watermaster suitable control of the diversion(s).
R59
This right when combined with all other rights shall provide no more than 3.5 afa per acre at the field headgate for irrigation of the lands above.
004
This right does not grant any right-of-way or easement across the land of another.
T07
The right holder shall accomplish the change authorized by transfer 74801 within one year of August 7, 2008.
T08
Failure of the right holder to comply with the conditions of transfer 74801 is cause for the Director to rescind approval of the transfer.
C18
This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.