Priority Date : 5/25/1887
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
PAHSIMEROI RIVER
SALMON RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
PAHSIMEROI RIVER
12N
24E
5
7
SW
SW
CUSTER
Rediversion
PAHSIMEROI RIVER
12N
24E
5
0
SE
SW
CUSTER
Rediversion
PAHSIMEROI RIVER
12N
24E
8
0
SE
SE
NW
CUSTER
Rediversion
PAHSIMEROI RIVER
12N
24E
16
0
SW
NW
CUSTER
Injection
PAHSIMEROI RIVER
12N
24E
32
0
SW
NW
CUSTER
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/01
10/31
6.00 CFS
TOTAL
6.00 CFS
Places of Use
Place of Use Legal Description : IRRIGATION (CUSTER county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
12N
24E
5
5
SW
NW
37.0
12N
24E
5
6
NW
SW
37.0
12N
24E
6
2
NW
NE
26.0
12N
24E
6
SW
NE
38.0
12N
24E
6
SE
NE
40.0
12N
24E
6
3
NE
NW
6.2
12N
24E
6
SE
NW
15.0
12N
24E
6
NE
SW
20.0
12N
24E
6
NE
SE
38.0
12N
24E
6
NW
SE
37.0
13N
24E
31
NE
SW
17.0
13N
24E
31
NW
SE
31.0
13N
24E
31
SW
SE
2.9
13N
24E
31
SE
SE
29.0
Irrigation Totals
Total Acres
Acre Limit
374.10
304.00
Conditions
Code
Condtions
X27
This right is limited to the irrigation of 304 acres within the place of use described above in a single irrigation season.
X35
Rights 73-145, 73-146 and 73-191 when combined shall not exceed the irrigation of 374.1 acres.
When the upper point of rediversion on Goldburg Creek located at 12N 24E Sec. 8 SESENW is diverting water, the lower points of rediversion on Goldburg Creek located at 12N 24E Sec. 5 SESW and SWSW are limited to a diversion rate under this water right of 3.0 cfs.
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 73.
004
This right does not grant any right-of-way or easement across the land of another.
R59
This right when combined with all other rights shall provide no more than 3.5 afa per acre at the field headgate for irrigation of the lands above.
G01
Point of injection into and points of rediversion from Goldburg Creek.
T07
The right holder shall accomplish the change authorized by this transfer within one year(s) of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
R43
The right holder shall maintain measuring devices and lockable controlling works of a type approved by the Department in a manner that will provide the watermaster suitable control of the diversions, including the point of injection and points of rediversion.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.