GLOBAL BANKING & MARKETS LOAN SYNDICATIONS
40 TEMPERANCE ST 6TH FLOOR
TORONTO
ON
M5H 0B4
Water Right Status
Priority Date : 7/28/1988
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
11N
16E
2
0
SW
NW
CUSTER
GROUND WATER
11N
16E
3
1
NE
NE
CUSTER
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
INDUSTRIAL
01/01
12/31
1.11 CFS
803.60 AFA
TOTAL
1.11 CFS
803.60 AFA
Places of Use
Place of Use Legal Description : INDUSTRIAL (CUSTER county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
11N
16E
12
NE
NE
11N
16E
12
NW
NE
Conditions
Code
Condtions
Industrial use is for the milling of molybdenum ore.
When water used under this right is discharged into a natural channel or surface system, settling ponds must be maintained which are capable of reducing the silt load to such a level that the quality of water shall meet idaho water quality standards and will not impair other beneficial uses.
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District 170.
R43
The right holder shall maintain a measuring device and lockable controlling works of a type approved by the Department in a manner that will provide the watermaster suitable control of the diversion(s).
X35
Rights 72-7414, 72-7193 and 72-7257 when combined shall not exceed a combined total of 3108.0 AF.
U42
Place of use does not include federal public lands.
This right is subject to the agreement dated April 26, 1989 between right holder and protestant(s) to the extent such agreement covers matters within the jurisdiction of the department of water resources.
T07
The right holder shall accomplish the change authorized by this transfer within 1 year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.