Priority Date : 10/10/1911
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
UNNAMED STREAM
SINKS
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
UNNAMED STREAM
14N
18E
2
0
NW
SW
NW
CUSTER
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/01
10/31
0.04 CFS
TOTAL
0.04 CFS
Places of Use
Place of Use Legal Description : IRRIGATION (CUSTER county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
14N
18E
2
SW
NW
12.0
Irrigation Totals
Total Acres
Acre Limit
12.00
Conditions
Code
Condtions
Diversion of water is limited to those times water is available for diversion under this right and priority from the original spring source located within SESWNE, Sec. 3, T14N, R18E.
X35
Rights 72-7A, 72-10032, 72-16559, and 72-16560 when combined shall not exceed the irrigation of 12 acres.
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 72A.
R02
A lockable device subject to the approval of the Department shall be maintained on the diverting works in a manner that will provide the watermaster suitable control of the diversion.
01R
When notified by the Department, the right holder shall install and maintain a measuring device of a type acceptable to the Department as part of the diverting works.
X36
Right 72-16559 is also diverted through the point(s) of diversion described above.
T07
The right holder shall accomplish the change authorized by this exchange within one year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this exchange is cause for the Director to rescind approval of the exchange.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.