Water Right Report : 67-7167( Decreed/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner FAIRCHILD, VIRGIL 920 NW 11TH AVE PAYETTE ID 83661-5200
Original Owner GAERTNER, A DAWSON PO BOX 46 MIDVALE ID 83645

Water Right Status

Priority Date : 8/24/1973
Basis : Decreed
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
UNNAMED SLOUGH WEISER RIVER
WEISER RIVER SNAKE RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
UNNAMED SLOUGH 14N 03W 33 0 NE SE WASHINGTON
WEISER RIVER 14N 03W 34 0 SE NW WASHINGTON

Water Uses

Beneficial Use From To Diversion Rate Volume
IRRIGATION 05/15 11/15 1.45 CFS 400.00 AFA
TOTAL 1.45 CFS 400.00 AFA

Places of Use

Place of Use Legal Description : IRRIGATION (WASHINGTON county)
Township Range Section Lot QQQ QQ Q Acres
14N 03W 34 NE NW 14.0
14N 03W 34 NW NW 9.0
14N 03W 34 SW NW 23.0
14N 03W 34 SE NW 25.0
14N 03W 34 NE SW 28.0
14N 03W 34 NW SW 1.0
Irrigation Totals
Total Acres Acre Limit
100.00

Conditions

Code Condtions
C18 This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
S39 The use of water for irrigation under this right may begin as early as March 15 provided other elements of the right are not exceeded. The use of water before May 15 under this remark is subordinate to all water rights having no subordinated early irrigation use and a priority date earlier than the date a partial decree is entered for this right.
R01 A measuring device of a type approved by this Department shall be maintained as a part of the diverting works.
Water diverted from the unnamed slough is exchanged for water diverted from the Weiser River.
C05 Right includes accomplished change in place of use pursuant to Section 42-1425, Idaho Code.
Dates
  • Licensed Date :
  • Decreed Date : 12/11/2008
  • Permit Proof Due Date :
  • Permit Proof Made Date : 1/1/1900
  • Permit Approved Date :
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date:
  • Protest Deadline Date:
Other Information
  • State or Federal : S
  • Water District Number : 67
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False