Priority Date : 6/15/1974
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
SPRING
WEST PINE CREEK
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
SPRING
15N
04W
19
0
SE
NW
WASHINGTON
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
POWER
01/01
12/31
0.04 CFS
DOMESTIC
01/01
12/31
0.02 CFS
TOTAL
0.04 CFS
29.50 AFA
Places of Use
Place of Use Legal Description : POWER (WASHINGTON county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
15N
04W
20
SW
NW
Place of Use Legal Description : DOMESTIC (WASHINGTON county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
15N
04W
20
SW
NW
Conditions
Code
Condtions
C18
This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
025
This right does not constitute Idaho Public Utilities Commission or Federal Energy Regulatory Commission approval that may be required.
The maximum diversion volume is defined as the maximum allowable volume of water that may be diverted annually from the source under this right. The use of water confirmed by this right is limited to the amount which can actually by beneficially used. The maximum diversion volume may be adjusted to more accurately describe the beneficial use or to implement accepted standards of diversion and use efficiency.
R23
The water right confirmed in this license for hydropower purposes shall be junior and subordinate to all rights to the use of water, other than hydropower, within the State of Idaho that are initiated later in time than the priority of this license and shall not give rise to any right or claim against any future rights to the use of water, other than hydropower, within the State of Idaho initiated later in time than the priority of this license.
The diversion and use of water for hydropower purposes under this license is subject to review by the Director on or after September 1, 2004. Upon appropriate findings relative to the interest of the public, the Director may cancel all or any part of the use authorized herein and may revise, delete or add conditions under which the rights may be exercised.