Priority Date : 10/22/2010
Basis : License
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
11N
06W
19
1
NE
NE
WASHINGTON
GROUND WATER
11N
06W
19
1
NE
NE
WASHINGTON
GROUND WATER
11N
06W
19
1
NE
NE
WASHINGTON
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
03/01
11/15
0.12 CFS
27.90 AFA
STOCKWATER
01/01
12/31
0.03 CFS
0.70 AFA
TOTAL
0.15 CFS
28.60 AFA
Places of Use
Place of Use Legal Description : IRRIGATION (WASHINGTON county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
11N
06W
19
1
NE
NE
6.2
Place of Use Legal Description : STOCKWATER (WASHINGTON county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
11N
06W
19
1
NE
NE
Irrigation Totals
Total Acres
Acre Limit
6.20
Conditions
Code
Condtions
044
Use of water under this right is subject to policies set forth in the State of Idaho Water Plan, including Policy No. 5G.
01M
After specific notification by the Department, the right holder shall install a suitable measuring device or shall enter into an agreement with the Department to use power records to determine the amount of water diverted and shall annually report the information to the Department.
R65
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 4.5 afa per acre at the field headgate for irrigation of the lands above.
103
When ordered by the Director, the right holder shall provide mitigation acceptable to the Director to offset depletion of lower Snake River flows needed for migrating anadromous fish. The amount of water required for mitigation, which is to be released into the Snake River or a tributary for this purpose, will be determined by the Director based upon the reduction in flow caused by the use of water pursuant to this right. Any order of the Director issued in accordance with this paragraph shall be in conformance with applicable rules allowing the right holder due process as the need for mitigation and the amount of mitigation are determined.