Water Right Report : 65-23857( License/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner WHITE, KATHERINE NICOLE 30 COUNTY BYPASS RD HORSESHOE BND ID 83629-9000
Previous Owner DACE, JOSHUA 30 COUNTY BYPASS RD HORSESHOE BND ID 83629-9000
Previous Owner DACE, KATHERINE 30 COUNTY BYPASS RD HORSESHOE BND ID 83629-9000
Representative WHITE, LAWRENCE 5802 122ND ST GIG HARBOR WA 98332-8130

Water Right Status

Priority Date : 11/15/2019
Basis : License
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
GROUND WATER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
GROUND WATER 06N 02E 9 0 NW SE BOISE

Water Uses

Beneficial Use From To Diversion Rate Volume
IRRIGATION 03/15 10/31 0.03 CFS 4.50 AFA
DOMESTIC 01/01 12/31 0.06 CFS 1.20 AFA
TOTAL 0.09 CFS 5.70 AFA

Places of Use

Place of Use Legal Description : IRRIGATION (BOISE county)
Township Range Section Lot QQQ QQ Q Acres
06N 02E 9 NW SE 1.0
Place of Use Legal Description : DOMESTIC (BOISE county)
Township Range Section Lot QQQ QQ Q Acres
06N 02E 9 NW SE
Irrigation Totals
Total Acres Acre Limit
1.00

Conditions

Code Condtions
R69 This right when combined with all other rights shall provide no more than 0.03 cfs per acre nor more than 4.5 afa per acre at the field headgate for irrigation of the place of use.
132 Domestic use is for 2 homes. Irrigation of lawn, garden and landscaping associated with the homes is authorized under the irrigation component of this right.
046 Right holder shall comply with the drilling permit requirements of Idaho Code § 42-235 and applicable Well Construction Rules of the Department.
103 When ordered by the Director, the right holder shall provide mitigation acceptable to the Director to offset depletion of lower Snake River flows needed for migrating anadromous fish. The amount of water required for mitigation, which is to be released into the Snake River or a tributary for this purpose, will be determined by the Director based upon the reduction in flow caused by the use of water pursuant to this right. Any order of the Director issued in accordance with this paragraph shall be in conformance with applicable rules allowing the right holder due process as the need for mitigation and the amount of mitigation are determined.
Dates
  • Licensed Date : 10/20/2025
  • Decreed Date :
  • Permit Proof Due Date : 2/1/2025
  • Permit Proof Made Date : 12/16/2024
  • Permit Approved Date : 2/11/2020
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date: 11/15/2019
  • Protest Deadline Date: 12/23/2019
Other Information
  • State or Federal : S
  • Water District Number : EXC
  • Generic Max Rate Per Acre : 0.03
  • Generic Max Volume Per Acre : 4.5
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False