Priority Date : 9/10/2004
Basis : License
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
FALL CREEK
PAYETTE LAKE
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
FALL CREEK
19N
03E
26
0
SE
SE
VALLEY
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
RECREATION STORAGE
01/01
12/31
3.50 AFA
AESTHETIC STORAGE
01/01
12/31
3.50 AFA
DIVERSION TO STORAGE
01/01
12/31
0.20 CFS
TOTAL
0.20 CFS
3.50 AFA
Places of Use
Place of Use Legal Description : RECREATION STORAGE (VALLEY county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
19N
03E
26
4
SW
SE
19N
03E
35
NW
NE
Place of Use Legal Description : AESTHETIC STORAGE (VALLEY county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
19N
03E
26
4
SW
SE
19N
03E
35
NW
NE
Conditions
Code
Condtions
Aesthetic & recreation storage purposes are for a small pond not to exceed 2.3 af in size.
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 65.
01P
Upon specific notification by the Department, the right holder shall install a lockable device of a type acceptable to the Department in a manner that will provide the watermaster suitable control of the diversion.
047
The availability of water for this right is subject to all prior water rights of Lake Reservoir Co.
103
When ordered by the Director, the right holder shall provide mitigation acceptable to the Director to offset depletion of lower Snake River flows needed for migrating anadromous fish. The amount of water required for mitigation, which is to be released into the Snake River or a tributary for this purpose, will be determined by the Director based upon the reduction in flow caused by the use of water pursuant to this right. Any order of the Director issued in accordance with this paragraph shall be in conformance with applicable rules allowing the right holder due process as the need for mitigation and the amount of mitigation are determined.