Priority Date : 9/14/1982
Basis : License
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
PAYETTE RIVER
SNAKE RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
PAYETTE RIVER
07N
02E
26
5
SW
SW
BOISE
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
POWER
01/01
12/31
3500.00 CFS
1960000.00 AFA
TOTAL
3500.00 CFS
1960000.00 AFA
Places of Use
Place of Use Legal Description : POWER (BOISE county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
07N
02E
32
5
SW
NE
Conditions
Code
Condtions
027
Use of water under this right shall be non-consumptive.
R22
The rights for the use of water confirmed in this license shall be junior and subordinate to all rights for the use of water other than hydropower, within the Payette River Basin that are initiated later in time than the priority of this right and shall not give rise to any right or claim against any future rights for the use of water, other than hydropower, within the Payette River Basin initiated later in time than the priority of this right.
R43
The right holder shall maintain a measuring device and lockable controlling works of a type approved by the Department in a manner that will provide the watermaster suitable control of the diversion.
X42
The diversion and use of water for hydropower purposes under this license is subject to review by the Director on or after May 21, 2036. Upon appropriate findings relative to the interest of the public, the Director may cancel all or any part of the use authorized herein and may revise, delete or add conditions under which the right may be exercised.
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 65.
A minimum bypass flow of 400 cubic feet per second or the inflow, whichever is less, must be maintained within the Payette River from the point of diversion to the point of reinjection to the river.
The operation of this power system shall not alter the normal flow of the Payette River downstream from the power plant.
025
This right does not constitute Idaho Public Utilities Commission or Federal Energy Regulatory Commission approval that may be required.