C/O SCOTT A MAGNUSON
BARKER ROSHOLT & SIMPSON LLP
1010 W JEFFERSON ST STE 102
PO BOX 2139
BOISE
ID
83701-2139
Current Owner
BOISE PROJECT BOARD OF CONTROL
2465 W OVERLAND RD
BOISE
ID
83705-3155
Water Right Status
Priority Date : 8/31/1977
Basis : License
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
BOISE RIVER
SNAKE RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
BOISE RIVER
02N
03E
11
7
SE
NE
ADA
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
POWER
01/01
12/31
5700.00 CFS
TOTAL
5700.00 CFS
Places of Use
Place of Use Legal Description : POWER (ADA county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
02N
03E
11
4
NE
NE
Conditions
Code
Condtions
913
The term of this water right shall run concurrently with Lucky Peak Power Plant Project license 2832 issued by the Federal Energy Regulatory Commission (FERC), which expires on May 31, 2030. The term shall automatically extend to run concurrently with any annual renewals of the project's FERC license. Prior to the issuance of a subsequent or new FERC license for the project, the Director may review the water right license and may issue an order canceling all or any part of the use, establishing a new term, or revising, adding or deleting conditions under which the water right may be exercised. The order shall take effect on the date the current term, as may be extended through annual renewals, expires. If the Director does not issue such an order, the term shall automatically extend to a length equal to the project's subsequent or new FERC license and any prior conditions on the water right license shall remain in effect.
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 63.
F06
The following rights are diverted through the point of diversion described above: 63-9019 and 63-11069.
R22
The rights for the use of water confirmed in this license shall be junior and subordinate to all rights for the use of water other than hydropower, within the State of Idaho that are initiated later in time than the priority of this right and shall not give rise to any right or claim against any future rights for the use of water, other than hydropower, within the State of Idaho initiated later in time than the priority of this right.
027
Use of water under this right shall be non-consumptive.
R43
The right holder shall maintain a measuring device and lockable controlling works of a type approved by the Department in a manner that will provide the watermaster suitable control of the diversion(s).
025
This right does not constitute Idaho Public Utilities Commission or Federal Energy Regulatory Commission approval that may be required.
This water right does not convey any authority to require or demand the release of water but shall only be effective to allow generation of hydroelectricity using water released under existing rights and operating procedures for irrigation, flood control, fish and wildlife, and other authorized purposes.
004