Water Right Report : 63-3532-B ( Decreed/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner LGD VENTURES LLC 35 GREENHORN RD HAILEY ID 83333
Original Owner HOWARD, JOHN P 1987 RIDGECREST DR BOISE ID 83712
Original Owner HOWARD, RUTH E 5121 BELAIR BOISE ID 83705
Original Owner HULME, DON A 3820 AIRPORT AVE CALDWELL ID 83605
Original Owner STECK, WESLEY J 821 LONE STAR RD NAMPA ID 83651

Water Right Status

Priority Date : 10/21/1966
Basis : Decreed
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
GROUND WATER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
GROUND WATER 02N 03W 13 0 NE NW CANYON

Water Uses

Beneficial Use From To Diversion Rate Volume
IRRIGATION 04/01 10/31 1.14 CFS 346.50 AFA
TOTAL 1.14 CFS 346.50 AFA

Places of Use

Place of Use Legal Description : IRRIGATION (CANYON county)
Township Range Section Lot QQQ QQ Q Acres
02N 03W 13 NW NE 39.0
02N 03W 13 NE NW 38.0
Irrigation Totals
Total Acres Acre Limit
77.00

Conditions

Code Condtions
TRANS. 2075.
C18 This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
R01 A measuring device of a type approved by this Department shall be maintained as a part of the diverting works.
S39 The use of water for irrigation under this right may begin as early as March 1 and may continue to as late as November 15, provided other elements of the right are not exceeded. The use of water before April 1 and after October 31 under this remark is subordinate to all water rights having no subordinated early or late irrigation use and a priority date earlier than the date a partial decree is entered for this right.
Dates
  • Licensed Date :
  • Decreed Date : 2/6/2009
  • Permit Proof Due Date :
  • Permit Proof Made Date :
  • Permit Approved Date :
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date:
  • Protest Deadline Date:
Other Information
  • State or Federal : S
  • Water District Number : TBD
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False