Priority Date : 5/8/2015
Basis : License
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
01N
02W
1
0
SW
NW
CANYON
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
03/01
11/15
1.18 CFS
102.00 AFA
TOTAL
1.18 CFS
102.00 AFA
Places of Use
Place of Use Legal Description : IRRIGATION (CANYON county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
01N
02W
1
3
NE
NW
15.0
01N
02W
1
4
NW
NW
30.0
01N
02W
1
SW
NW
28.0
Irrigation Totals
Total Acres
Acre Limit
73.00
Conditions
Code
Condtions
R61
This right when combined with all other rights shall provide no more than 4.5 afa per acre at the field headgate for irrigation of the place of use.
WB7
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor exceed a combined annual maximum diversion volume of 240.0 af at the field headgate for the place of use.
The total volume of water diverted pursuant to this right shall not exceed 102 AF each irrigation season.
R19
The right holder shall maintain a totalizing measuring device of a type approved by the Department as a part of the diverting works.
067
The right holder shall record the quantity of water diverted and annually report diversions of water and/or other pertinent hydrologic and system information as required by Idaho Code § 42-701.
The right holder shall mitigate for the depletion of water stored in Lake Lowell that will occur as a result of the ground water diversions authorized by this right. Prior to March 1 each year, the right holder shall make 3.0 AF of water available to the Boise Project Board of Control for diversion from the Boise River at the New York Canal for use within its member irrigation districts. The required supply of mitigation water may be rented from the Water District 63 Rental Pool or the Water Supply Bank, or it may result from the permanent transfer of a water right or portion of a water right. The right holder may arrange for the necessary mitigation water supply in multiple year increments. Each time the right holder enters into a new rental or other arrangement for the required mitigation water supply, the right holder shall give a copy of the agreement to the Boise Project Board of Control within seven days of the execution of the agreement. If the right holder does not comply with the mitigation requirement for any irrigation season, the right holder shall not divert water pursuant to this water right during that irrigation season.
943
The right holder shall make full beneficial use of all surface water available to the right holder for irrigation of lands within the authorized place of use for this right. The right holder may divert ground water under this right to irrigate land with appurtenant surface water rights when the surface water supply is not reasonably sufficient to irrigate the place of use for this water right or is not available due to drought, curtailment by priority, or the seasonal startup and shutoff or maintenance schedule for canal company or irrigation district deliveries. The right holder shall not divert ground water for irrigation purposes under this right if use of the surface water supply is intentionally discontinued or reduced (for example abandoned, forfeited, sold, disallowed by court decree, or leased to the Water Supply Bank), or is not deliverable due to non-payment of annual assessments, without an approved transfer pursuant to Idaho Code § 42-222 or other Department approval.
103
When ordered by the Director, the right holder shall provide mitigation acceptable to the Director to offset depletion of lower Snake River flows needed for migrating anadromous fish. The amount of water required for mitigation, which is to be released into the Snake River or a tributary for this purpose, will be determined by the Director based upon the reduction in flow caused by the use of water pursuant to this right. Any order of the Director issued in accordance with this paragraph shall be in conformance with applicable rules allowing the right holder due process as the need for mitigation and the amount of mitigation are determined.