Priority Date : 2/27/1971
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
03N
03W
17
1
NW
SE
CANYON
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
03/01
10/01
0.02 CFS
TOTAL
0.02 CFS
Places of Use
Place of Use Legal Description : IRRIGATION (CANYON county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
03N
03W
17
1
NW
SE
2.1
Irrigation Totals
Total Acres
Acre Limit
2.10
Conditions
Code
Condtions
046
Right holder shall comply with the drilling permit requirements of Section 42-235, Idaho Code and applicable Well Construction Rules of the Department.
X35
Rights 63-34015 and 63-34016 when combined shall not exceed a total annual maximum diversion volume of 9.5 af at the field headgate, and the irrigation of 2.1 acres.
X61
The period of use for the irrigation described in this approval may be extended to an ending date of 11/15 provided that beneficial use of the water can be shown and other elements of the right are not exceeded. The use of water after 10/1 is subordinate to all water rights having no subordinated early or late irrigation use and a priority date earlier than April 29, 2009.
R69
This right when combined with all other rights shall provide no more than 0.03 cfs per acre nor more than 4.5 afa per acre at the field headgate for irrigation of the place of use.
F05
Right Nos. 63-34015 and 63-34016 are diverted through point of diversion described above.
T07
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.