Priority Date : 3/1/1964
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
BOISE RIVER
SNAKE RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
BOISE RIVER
05N
05W
25
0
NW
NW
CANYON
Injection
BOISE RIVER
05N
05W
25
2
SW
SE
CANYON
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
MITIGATION
03/01
11/15
2.79 CFS
TOTAL
2.79 CFS
Places of Use
Place of Use Legal Description : MITIGATION (CANYON county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
05N
05W
23
NW
NE
05N
05W
23
SW
NE
05N
05W
23
SE
NE
05N
05W
23
NE
NW
05N
05W
23
SE
NW
05N
05W
23
NE
SE
05N
05W
23
SE
SE
05N
05W
24
NE
SW
05N
05W
24
NW
SW
05N
05W
24
SW
SW
05N
05W
24
SE
SW
05N
05W
24
SW
SE
Conditions
Code
Condtions
C18
This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
S49
Diversion for mitigation under this water right prior to April 1 and after October 31 shall occur only when the natural flow of the Boise River below the Star Bridge in Township 04 North, Range 01 West, Section 18, NE¼ of the SE¼ of the SE¼, Boise Meridian (approximate river mile 33.9) is sufficient for water to be available for diversion at the point of diversion described above, provided that any such use of this water right prior to April 1 and after October 31 shall not interfere with storage of water under water rights for Lake Lowell, Lucky Peak, Arrowrock and Anderson Ranch Reservoirs.
This right is diverted from the Boise River in the SWSE, S25, Twp. 5N, Rge. 5W, and injected into Sand Hollow Creek in the NWNW, S. 25, Twp. 5N, Rge. 5W for mitigation of Sand Hollow Creek Right Nos. 63-33570 and 63-33571.