Water Right Report : 63-33263( License/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner GUST, DALE 5373 EMERALD ST BOISE ID 83706
Current Owner GUST, STACY 5373 EMERALD ST BOISE ID 83706

Water Right Status

Priority Date : 8/12/2009
Basis : License
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
GROUND WATER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
GROUND WATER 01N 02E 32 0 NW NW ADA

Water Uses

Beneficial Use From To Diversion Rate Volume
IRRIGATION 03/01 11/15 0.79 CFS 178.00 AFA
TOTAL 0.79 CFS 178.00 AFA

Places of Use

Place of Use Legal Description : IRRIGATION (ADA county)
Township Range Section Lot QQQ QQ Q Acres
01N 02E 32 NE NW 32.0
01N 02E 32 NW NW 7.5
Irrigation Totals
Total Acres Acre Limit
39.50

Conditions

Code Condtions
R65 This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 4.5 afa per acre at the field headgate for irrigation of the place of use.
073 Diversion and use of water with a temperature greater than 85 degrees Fahrenheit is not authorized under this right.
R19 The right holder shall maintain a totalizing measuring device of a type approved by the Department as a part of the diverting works.
The point of diversion (well) authorized for this right shall include a measuring device or other suitable method to allow measurement of the static water level in the well.
103 When ordered by the Director, the right holder shall provide mitigation acceptable to the Director to offset depletion of lower Snake River flows needed for migrating anadromous fish. The amount of water required for mitigation, which is to be released into the Snake River or a tributary for this purpose, will be determined by the Director based upon the reduction in flow caused by the use of water pursuant to this right. Any order of the Director issued in accordance with this paragraph shall be in conformance with applicable rules allowing the right holder due process as the need for mitigation and the amount of mitigation are determined.
Dates
  • Licensed Date : 12/17/2018
  • Decreed Date :
  • Permit Proof Due Date : 7/1/2018
  • Permit Proof Made Date : 6/1/2018
  • Permit Approved Date : 7/18/2013
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date: 8/12/2009
  • Protest Deadline Date: 1/3/2011
Other Information
  • State or Federal :
  • Water District Number : TBD
  • Generic Max Rate Per Acre : 0.02
  • Generic Max Volume Per Acre : 4.5
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False