| Code |
Condtions |
| 218 |
Water shall not be diverted from fire protection storage except to fight or repel an existing fire. |
| X35 |
Rights 63-32646 and 63-35352 when combined shall not exceed a total annual maximum diversion volume of 28.4 af. |
| X35 |
Rights 63-32646 and 63-34719 when combined shall not exceed a total diversion rate of 1.11 cfs. |
| 219 |
Right(s) 63-32646, 63-34719, 63-34008, 63-35352, and 63-33164 authorize total annual storage volume of 89.3 acre-feet, 61.4 acre-feet to be used for the initial filling or carryover storage of the ponds and 27.9 acre-feet for the replacement of losses caused by seepage and evaporation. |
| 220 |
The two (2) pond(s) established by the storage of water under this right and 63-34719 shall not exceed a total capacity of 61.4 acre-feet or a total surface area of 5.9 acre(s). |
| 936 |
Per Transfer 73810 and subsequent ownership change split, Rights 63-33164 and 63-34008 authorizes the diversion of 0.07 cfs and 12.9 af of water to storage to offset evaporation losses from the pond(s) authorized by this right. |
| X35 |
Rights 63-32646, 63-7825A, 63-7825C, 63-32076, 63-32922, 63-33164, 63-33383, 63-33384, 63-34007, 63-34008, 63-34360, 63-34361, 63-34362, 63-34363, & 63-34719 when combined shall not exceed a total diversion rate of 5.08 cfs. |
| 01M |
After specific notification by the Department, the right holder shall install a suitable measuring device or shall enter into an agreement with the Department to use power records to determine the amount of water diverted and shall annually report the information to the Department. |
| 004 |
This right does not grant any right-of-way or easement across the land of another. |
| X59 |
Point of diversion is located within Lots 2-4, Blk. 1, Crystal Lakes Phase 1 subdivision. |
| X60 |
Fire protection from storage place of use is located within Lots 2-6, Blk. 1 and Lots 1- 9, Blk. 2, Crystal Lakes Phase 1 subdivision. |
| X60 |
Fire protection storage and aesthetic storage place of use is located within Lots 2-4, Blk. 1 and Lots 1-3, Blk. 2, Crystal Lakes Phase 1 subdivision and Lot 5, Blk. 1, Crystal Lakes Phase 2 subdivision. |
| 103 |
When ordered by the Director, the right holder shall provide mitigation acceptable to the Director to offset depletion of lower Snake River flows needed for migrating anadromous fish. The amount of water required for mitigation, which is to be released into the Snake River or a tributary for this purpose, will be determined by the Director based upon the reduction in flow caused by the use of water pursuant to this right. Any order of the Director issued in accordance with this paragraph shall be in conformance with applicable rules allowing the right holder due process as the need for mitigation and the amount of mitigation are determined. |