Priority Date : 5/4/1960
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
01N
01W
14
0
NW
NW
ADA
GROUND WATER
01N
01W
15
0
NE
NE
ADA
GROUND WATER
01N
01W
15
0
NE
SE
ADA
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
03/15
11/15
1.98 CFS
446.00 AFA
TOTAL
1.98 CFS
446.00 AFA
Places of Use
Place of Use Legal Description : IRRIGATION (ADA county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
01N
01W
15
NE
NE
29.0
01N
01W
15
NW
NE
16.0
01N
01W
15
SW
NE
36.5
01N
01W
15
SE
NE
17.6
Irrigation Totals
Total Acres
Acre Limit
99.10
Conditions
Code
Condtions
T07
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.
A single new point of diversion is authorized in either NENE Sec 15, T01N, R01W or NWNW Sec 14, T01N, R01W.
186
Diversion of water from the additional well authorized under Transfer 80121 located in either NENE Sec 15, T01N, R01W or NWNW Sec 14, T01N, R01W shall not exceed a maximum diversion rate of 0.67 cfs.
01M
After specific notification by the Department, the right holder shall install a suitable measuring device or shall enter into an agreement with the Department to use power records to determine the amount of water diverted and shall annually report the information to the Department.
R65
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 4.5 afa per acre at the field headgate for irrigation of the lands above.
046
Right holder shall comply with the drilling permit requirements of Section 42-235, Idaho Code and applicable Well Construction Rules of the Department.
X61
The period of use for the irrigation described in this approval may be extended to a beginning date of 3/1 and an ending date of 11/15 provided that beneficial use of the water can be shown and other elements of the right are not exceeded. The use of water before 3/15 is subordinate to all water rights having no subordinated early or late irrigation use and a priority date earlier than February 6, 2009.