Water Right Report : 63-21474( Decreed/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner LEMP LANE PROPERTIES 23019 HWY 20-26 PARMA ID 83660
Previous Owner HAWKINS, CAREY G PO BOX 84 ELBERTA UT 84626-0084
Previous Owner HAWKINS, SANDRA J PO BOX 84 ELBERTA UT 84626-0084

Water Right Status

Priority Date : 2/15/1929
Basis : Decreed
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
BOISE RIVER SNAKE RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
BOISE RIVER 05N 04W 32 0 SE NE CANYON

Water Uses

Beneficial Use From To Diversion Rate Volume
IRRIGATION 03/01 11/15 1.20 CFS
TOTAL 1.20 CFS

Places of Use

Place of Use Legal Description : IRRIGATION (CANYON county)
Township Range Section Lot QQQ QQ Q Acres
05N 04W 30 9 SE SW 7.0
05N 04W 30 9 SW SE 36.0
05N 04W 31 10 NW NE 30.0
05N 04W 31 9 NE NW 17.0
Irrigation Totals
Total Acres Acre Limit
90.00

Conditions

Code Condtions
C18 This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
S49 Diversion for irrigation under this water right prior to April 1 and after October 31 shall occur only when the natural flow in the Boise River below the Star Bridge in Township 04 North, Range 01 West, Section 18, NE¼ of the SE¼ of the SE¼, Boise Meridian (approximate river mile 33.9) is sufficient for water to be available for diversion at the point of diversion described above, provided that any such use of this water right prior to April 1 and after October 31 shall be subordinated to water rights for storage in Lucky Peak Reservoir, Lake Lowell, Arrowrock Reservoir, and/or Anderson Ranch Reservoir, as decreed in SRBA Case No. 39576.
This right when combined with 63-368A shall not exceed a total combined diversion rate of 1.8 cfs at the field headgate.
F01 Water is delivered through the Baxter Canal.
Dates
  • Licensed Date :
  • Decreed Date : 4/3/2009
  • Permit Proof Due Date :
  • Permit Proof Made Date :
  • Permit Approved Date :
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date:
  • Protest Deadline Date:
Other Information
  • State or Federal : S
  • Water District Number : 63
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False