Water Right Report : 63-10240( License/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner BOISE PROJECT BOARD OF CONTROL 2465 W OVERLAND RD BOISE ID 83705-3155
Interested Party FARMERS UNION DITCH COMPANY LTD C/O ANDREW J WALDERA 1101 W RIVER ST STE 110 BOISE ID 83702-7067
Interested Party SETTLERS IRRIGATION DISTRICT SAWTOOTH LAW OFFICES C/O ANDREW J WALDERA 1101 W RIVER ST STE 110 BOISE ID 83702-7067
Interested Party PIONEER IRRIGATION DISTRICT PO BOX 426 CALDWELL ID 83606-0426
Interested Party FARMERS COOPERATIVE DITCH CO PO BOX 69 PARMA ID 83660-0069
Original Owner US DEPT OF INTERIOR BUREAU OF RECLAMATION 1150 N CURTIS RD STE 100 BOISE ID 83706-1234

Water Right Status

Priority Date : 6/11/1984
Basis : License
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
BOISE RIVER SNAKE RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
BOISE RIVER 03N 04E 13 7 NW SE ELMORE
BOISE RIVER 03N 04E 13 7 NW SE ELMORE

Water Uses

Beneficial Use From To Diversion Rate Volume
POWER 1/01 12/31 1680.00 CFS
TOTAL 1680.00 CFS

Places of Use

Place of Use Legal Description : POWER (ELMORE county)
Township Range Section Lot QQQ QQ Q Acres
03N 04E 13 7 NW SE

Conditions

Code Condtions
R05 Use of water under this right may be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 63.
R43 The right holder shall maintain a measuring device and lockable controlling works of a type approved by the Department in a manner that will provide the watermaster suitable control of the diversion(s).
004 This right does not grant any right-of-way or easement across the land of another.
025 This right does not constitute Idaho Public Utilities Commission or Federal Energy Regulatory Commission approval that may be required.
027 Use of water under this right shall be non-consumptive.
913 The term of this water right shall run concurrently with Arrowrock Hydroelectric Project license 4656 issued by the Federal Energy Regulatory Commission (FERC), which expires on February 28, 2039. The term shall automatically extend to run concurrently with any annual renewals of the project's FERC license. Prior to the issuance of a subsequent or new FERC license for the project, the Director may review the water right license and may issue an order canceling all or any part of the use, establishing a new term, or revising, adding or deleting conditions under which the water right may be exercised. The order shall take effect on the date the current term, as may be extended through annual renewals, expires. If the Director does not issue such an order, the term shall automatically extend to a length equal to the project's subsequent or new FERC license and any prior conditions on the water right license shall remain in effect.
R22 The right for the use of water confirmed in this license shall be junior and subordinate to all rights for the use of water other than hydropower, within the State of Idaho that are initiated later in time than the priority of this right and shall not give rise to any right or claim against any future rights for the use of water, other than hydropower, within the State of Idaho initiated later in time than the priority of this right.
This right does not convey any authority to require or demand the delivery or release of water, but shall only allow generation of hydroelectricity using water delivered or released to satisfy existing water rights and operating procedures, flood control, or other authorized purposes.
Construction, operation, maintenance, repair, replacement or modification of the project works and features under this right shall not injure, reduce, or impair existing water rights established under state law or water rights entitlements under federal contracts relating to the Boise River, its reservoirs, or its tributaries.
Dates
  • Licensed Date : 8/8/2019
  • Decreed Date :
  • Permit Proof Due Date : 8/1/2012
  • Permit Proof Made Date : 6/7/2010
  • Permit Approved Date : 8/6/2002
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date: 6/11/1984
  • Protest Deadline Date: 6/11/1984
Other Information
  • State or Federal :
  • Water District Number : 63
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False