SAWTOOTH LAW OFFICES
C/O ANDREW J WALDERA
1101 W RIVER ST STE 110
BOISE
ID
83702-7067
Interested Party
PIONEER IRRIGATION DISTRICT
PO BOX 426
CALDWELL
ID
83606-0426
Interested Party
FARMERS COOPERATIVE DITCH CO
PO BOX 69
PARMA
ID
83660-0069
Original Owner
US DEPT OF INTERIOR
BUREAU OF RECLAMATION
1150 N CURTIS RD STE 100
BOISE
ID
83706-1234
Water Right Status
Priority Date : 6/11/1984
Basis : License
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
BOISE RIVER
SNAKE RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
BOISE RIVER
03N
04E
13
7
NW
SE
ELMORE
BOISE RIVER
03N
04E
13
7
NW
SE
ELMORE
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
POWER
1/01
12/31
1680.00 CFS
TOTAL
1680.00 CFS
Places of Use
Place of Use Legal Description : POWER (ELMORE county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
03N
04E
13
7
NW
SE
Conditions
Code
Condtions
R05
Use of water under this right may be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 63.
R43
The right holder shall maintain a measuring device and lockable controlling works of a type approved by the Department in a manner that will provide the watermaster suitable control of the diversion(s).
004
This right does not grant any right-of-way or easement across the land of another.
025
This right does not constitute Idaho Public Utilities Commission or Federal Energy Regulatory Commission approval that may be required.
027
Use of water under this right shall be non-consumptive.
913
The term of this water right shall run concurrently with Arrowrock Hydroelectric Project license 4656 issued by the Federal Energy Regulatory Commission (FERC), which expires on February 28, 2039. The term shall automatically extend to run concurrently with any annual renewals of the project's FERC license. Prior to the issuance of a subsequent or new FERC license for the project, the Director may review the water right license and may issue an order canceling all or any part of the use, establishing a new term, or revising, adding or deleting conditions under which the water right may be exercised. The order shall take effect on the date the current term, as may be extended through annual renewals, expires. If the Director does not issue such an order, the term shall automatically extend to a length equal to the project's subsequent or new FERC license and any prior conditions on the water right license shall remain in effect.
R22
The right for the use of water confirmed in this license shall be junior and subordinate to all rights for the use of water other than hydropower, within the State of Idaho that are initiated later in time than the priority of this right and shall not give rise to any right or claim against any future rights for the use of water, other than hydropower, within the State of Idaho initiated later in time than the priority of this right.
This right does not convey any authority to require or demand the delivery or release of water, but shall only allow generation of hydroelectricity using water delivered or released to satisfy existing water rights and operating procedures, flood control, or other authorized purposes.
Construction, operation, maintenance, repair, replacement or modification of the project works and features under this right shall not injure, reduce, or impair existing water rights established under state law or water rights entitlements under federal contracts relating to the Boise River, its reservoirs, or its tributaries.