Water Right Report : 63-10192-B ( Decreed/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner CORP OF THE PRESIDING BISHOP CHURCH OF JESUS CHRIST OF LATTER DAY SAINTS ATTN: NATURAL RESOURCE SERVICES 50 E NORTH TEMPLE ST SALT LAKE CTY UT 84150-0012
Original Owner CHURCH OF JESUS CHRIST OF THE LATTER DAY SAINTS BOISE STAKE C/O CECIL F OLSEN PRES 2111 WARM SPRINGS AVE BOISE ID 83702

Water Right Status

Priority Date : 6/22/1983
Basis : Decreed
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
GROUND WATER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
GROUND WATER 06N 05E 34 0 NW NE BOISE

Water Uses

Beneficial Use From To Diversion Rate Volume
IRRIGATION 04/15 10/15 0.02 CFS 1.80 AFA
TOTAL 0.02 CFS 1.80 AFA

Places of Use

Place of Use Legal Description : IRRIGATION (BOISE county)
Township Range Section Lot QQQ QQ Q Acres
06N 05E 34 NE NE 0.1
06N 05E 34 NW NE 0.4
Irrigation Totals
Total Acres Acre Limit
0.50

Conditions

Code Condtions
R59 This right when combined with all other rights shall provide no more than 3.5 afa per acre at the field headgate for irrigation of the place of use.
S38 The use of water for irrigation under this right may begin as early as April 1 and may continue to as late as October 31, provided other elements of the right are not exceeded. The use of water before April 15 and after October 15 under this remark is subordinate to all water rights having no subordinated early or late irrigation use and a priority date earlier than the date a partial decree is entered for this right.
T07 The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval.
T08 Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T19 Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as determined by the Snake River Basin Adjudication court in the final unified decree entered 08/26/2014.
Dates
  • Licensed Date :
  • Decreed Date : 4/21/2003
  • Permit Proof Due Date :
  • Permit Proof Made Date :
  • Permit Approved Date :
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date:
  • Protest Deadline Date:
Other Information
  • State or Federal : S
  • Water District Number : TBD
  • Generic Max Rate Per Acre : 0.03
  • Generic Max Volume Per Acre : 3.5
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False