Water Right Report : 63-10028( License/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner ADA COUNTY 200 W FRONT ST BOISE ID 83702-7300
Lienholder THE FUJI BANK LTD 333 S GRAND AVE LOS ANGELES CA 90071
Lienholder IDAHO POWER COMPANY PO BOX 70 BOISE ID 83707-0070
Original Owner COUNTY OF ADA OPERATIONS DEPARTMENT 200 W FRONT ST RM 3266 BOISE ID 83072
Previous Owner FULCRUM INC C/O CHI 1555 SHORELINE DR #200 BOISE ID 83707
Trustee STEWART TITLE OF IDAHO INC 1412 W IDAHO ST BOISE ID 83702

Water Right Status

Priority Date : 4/28/1983
Basis : License
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
BOISE RIVER SNAKE RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
BOISE RIVER 03N 03E 29 2 SW SE ADA

Water Uses

Beneficial Use From To Diversion Rate Volume
POWER 1/01 12/31 2000.00 CFS 1445400.00 AFA
TOTAL 2000.00 CFS 1445400.00 AFA

Places of Use

Place of Use Legal Description : POWER (ADA county)
Township Range Section Lot QQQ QQ Q Acres
03N 03E 29 2 SW SE

Conditions

Code Condtions
R04 Use of water under this water right will be regulated by the watermaster of State Water District No. &DISTRICT.
025 This right does not constitute Idaho Public Utilities Commission or Federal Energy Regulatory Commission approval that may be required.
R22 The rights for the use of water confirmed in this license shall be junior and subordinate to all rights for the use of water other than hydropower, within the State of Idaho that are initiated later in time than the priority of this right and shall not give rise to any right or claim against any future rights for the use of water, other than hydropower, within the State of Idaho initiated later in time than the priority of this right.
027 Use of water under this right shall be non-consumptive.
The diversion and use of water for hydropower purposes under this license is subject to review by the Director after the date of expiration of license 4881-007 issued by the Federal Energy Regulatory Commission. Upon appropriate findings relative to the interest of the public, the Director may cancel all or any part of the use authorized herein and may revise, delete or add conditions under which the right may be exercised. A permanent measuring device shall be maintained to readily determine the rate of diversion for hydropower purposes. Facility known as Barber Dam Project.
Dates
  • Licensed Date : 2/24/1997
  • Decreed Date :
  • Permit Proof Due Date : 10/1/1992
  • Permit Proof Made Date : 10/1/1992
  • Permit Approved Date : 11/30/1987
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date: 4/28/1983
  • Protest Deadline Date:
Other Information
  • State or Federal :
  • Water District Number : 63
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False