| Code |
Condtions |
| X35 |
Rights 61-301A, 61-332, 61-333, 61-334, 61-335, 61-336, 61-337, 61-338, 61-339, 61-340, 61-343, 61-364, 61-2008, 61-2095A, 61-2199A, 61-2209A, 61-10363, 61-11844, 61-11847, 61-11854 and 61-11887A when combined shall not exceed the irrigation of 1368 acres. |
| X35 |
Rights 61-2095A, 61-2199A, 61-2209A and 61-11887A when combined shall not exceed a total diversion rate of 9.34 cfs, a total annual maximum diversion volume of 3200 af at the field headgate, and the irrigation of 800.9 acres. |
| X35 |
Rights 61-2095A, 61-2199A and 61-2209A when combined shall not exceed a total annual maximum diversion volume of 2390 af at the field headgate and the irrigation of 598 acres. |
| X35 |
Rights 61-2199A and 61-2209A when combined shall not exceed the irrigation of 401 acres. |
| R64 |
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 4.0 afa per acre at the field headgate for irrigation of the place of use. |
|
Prior to the diversion and use of water under Transfer Approval 84440, the right holder shall install and maintain on each point of diversion a measuring device and lockable controlling works of a type acceptable to the Department. |
| R05 |
Use of water under this right may be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 161. |
| X61 |
The period of use for the irrigation described in this approval may be extended to a beginning date of 3/15 and an ending date of 11/15 provided that beneficial use of the water can be shown and other elements of the right are not exceeded. The use of water before 04/01 and after 11/01 is subordinate to all water rights having no subordinated early or late irrigation use and a priority date earlier than 08/28/2002. |
| K01 |
Right No. 61-11887A is an enlargement of this right, 61-2095A, and 61-2199A pursuant to Idaho Code § 42-1426. |
| 046 |
Right holder shall comply with the drilling permit requirements of Idaho Code § 42-235 and applicable Well Construction Rules of the Department. |
| T07 |
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval. |
| T08 |
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer. |
| T19 |
Pursuant to Idaho Code § 42-1412(6), this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as determined by the Snake River Basin Adjudication court in the final unified decree entered 08/26/2014. |