| Code |
Condtions |
| T19 |
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree. |
| K01 |
Right 61-10378 is an enlargement of Right 61-2154 pursuant to Section 42-1426, Idaho Code. |
| C11 |
This water right is subordinate to all water rights with a priority date earlier than April 12, 1994, that are not decreed as enlargements pursuant to Section 42-1426, Idaho Code. As between water rights decreed as enlargements pursuant to Section 42-1426, Idaho Code, the earlier priority right is the superior right. |
| X27 |
This right is for an enlargement of 33 acres within the place of use described above. |
|
Rights 61-2154 and 61-10378 when combined shall not exceed a total diversion rate of 3.83 cfs, a total annual maximum diversion volume of 896 af at the field headgate, and the irrigation of 224 acres. |
|
Rights 61-2154, 61-7119, 61-7396 and 61-10378 when combined shall not exceed a total diversion rate of 5.70 cfs and the irrigation of 433 acres. |
|
Rights 61-2154, 61-7005, 61-7396 and 61-10378 when combined shall not exceed a total diversion rate of 9.06 cfs, a total annual maximum diversion volume of 2248 af at the field headgate, and the irrigation of 562 acres. |
|
Rights 61-2154, 61-7005, 61-7119, 61-7396 and 61-10378 when combined shall not exceed a total diversion rate of 9.06 cfs, a total annual maximum diversion volume of 2632 af at the field headgate, and the irrigation of 658 acres. |
| X35 |
Rights 61-2154, 61-2155, 61-7005, 61-7119, 61-7396 and 61-10378 when combined shall not exceed a total diversion rate of 13.18 cfs, a total annual maximum diversion volume of 3500 af at the field headgate, and the irrigation of 875 acres. |
| R64 |
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 4.0 afa per acre at the field headgate for irrigation of the lands above. |
| T17 |
Prior to diversion of water under this approval, the right holder shall provide a means of measurement acceptable to the Department from all authorized points of diversion which will allow determination of the total rate of diversion. |
| 01Q |
After specific notification by the Department, the right holder shall record the quantity of water diverted or shall enter into an agreement with the Department to determine the amount of water diverted from power records and shall annually report the information to the Department. |
| F06 |
The following rights are diverted through points of diversion described above: 61-2154, 61-2155, 61-7005, 61-7119, 61-7396 and 61-10378. |