Priority Date : 10/10/2017
Basis : License
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
SHOOFLY CREEK
SNAKE RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
SHOOFLY CREEK
05S
03E
35
0
SW
NE
OWYHEE
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
03/01
11/15
0.09 CFS
TOTAL
0.09 CFS
Places of Use
Place of Use Legal Description : IRRIGATION (OWYHEE county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
05S
03E
22
NE
SE
3.0
Irrigation Totals
Total Acres
Acre Limit
3.30
Conditions
Code
Condtions
R69
This right when combined with all other rights shall provide no more than 0.03 cfs per acre nor more than 4.5 afa per acre at the field headgate for irrigation of the place of use.
933
This right is for the use of trust water, and it is subject to review 5 years after its initial approval (date of permit approval) to re-evaluate the availability of trust water for the authorized use and to re-evaluate the public interest criteria for reallocating trust water.
934
When the minimum stream flow water rights in the Snake River at Murphy Gage are not being satisfied, the right holder shall cease diverting water for the consumptive uses authorized by this right. The minimum stream flow water rights are for 3,900 cfs from April 1 through October 31 and 5,600 cfs from November 1 through March 31. See IDAPA 37.03.08.030.
004
This right does not grant any right-of-way or easement across the land of another.
103
When ordered by the Director, the right holder shall provide mitigation acceptable to the Director to offset depletion of lower Snake River flows needed for migrating anadromous fish. The amount of water required for mitigation, which is to be released into the Snake River or a tributary for this purpose, will be determined by the Director based upon the reduction in flow caused by the use of water pursuant to this right. Any order of the Director issued in accordance with this paragraph shall be in conformance with applicable rules allowing the right holder due process as the need for mitigation and the amount of mitigation are determined.