Priority Date : 10/30/1980
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
ROCK CREEK
SNAKE RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
ROCK CREEK
09S
16E
25
0
NE
NW
NW
TWIN FALLS
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
POWER
1/01
12/31
175.00 CFS
TOTAL
175.00 CFS
Places of Use
Place of Use Legal Description : POWER (TWIN FALLS county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
09S
16E
23
12
SE
NE
Conditions
Code
Condtions
UNIT #1 GENERATOR 400 KW TURBINE 284 KW
UNIT #2 GENERATOR 510 KW TURBINE 450 KW
UNIT #3 GENERATOR 816 KW TURBINE 716 KW
UNIT #4 GENERATOR 816 KW TURBINE 716 KW
TOTAL 2166 KW
TOTAL HYDRAULIC HEAD ON POWERPLANT IS 165'.
C18
This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
X42
The diversion and use of water for hydropower purposes under this license is subject to review by the Director on or after July 9, 2019. Upon appropriate findings relative to the interest of the public, the Director may cancel all or any part of the use authorized herein and may revise, delete or add conditions under which the right may be exercised.
The project shall be operated in a manner that will not conflict or interfere with the future diversion of water for irrigation or other beneficial consumption.
162
Power generation is at the Rock Creek Power Plant.