Water Right Report : 47-7660( Decreed/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner PIGEON COVE POWER CO LLC C/O DALE TURNIPSEED 2231 SETTLERS LN TWIN FALLS ID 83301
Original Owner BONNEVILLE PACIFIC CORP C/O DAVID P HIRSCHI 257 E 200 S STE 800 SALT LAKE CITY UT 84111

Water Right Status

Priority Date : 1/7/1981
Basis : Decreed
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
LQ COULEE SNAKE RIVER
LS COULEE SNAKE RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
LQ COULEE 09S 16E 21 2 NW NE TWIN FALLS
LS COULEE 09S 16E 21 0 NW NW TWIN FALLS

Water Uses

Beneficial Use From To Diversion Rate Volume
POWER 01/01 12/31 65.00 CFS
TOTAL 65.00 CFS

Places of Use

Place of Use Legal Description : POWER (TWIN FALLS county)
Township Range Section Lot QQQ QQ Q Acres
09S 16E 16 5 SW SW

Conditions

Code Condtions
G21 The source of this water right is waste water. The wasting of water may be discontinued at any time.
C18 This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
08A This right is subject to the provisions of Sections 42-205 through 42-210, Idaho Code, restricting the sale, transfer, assignment, or mortgage of this right. Failure to comply with these provisions is cause for immediate cancellation of this right.
01C A flow measurement port or other device as specified by the Department shall be installed by the right holder to provide for the installation of measuring equipment and the determination of the rate of diversion by the Department.
R23 The water right confirmed in this license for hydropower purposes shall be junior and subordinate to all rights to the use of water, other than hydropower, within the State of Idaho that are initiated later in time than the priority of this license and shall not give rise to any right or claim against any future rights to the use of water, other than hydropower, within the State of Idaho initiated later in time than the priority of this license.
025 This right does not constitute Idaho Public Utilities Commission or Federal Energy Regulatory Commission approval that may be required.
027 Use of water under this right shall be non-consumptive.
17A This right shall be subject to future operation so that use of water under this right will not conflict or interfere with the future upstream diversion of water for irrigation or other beneficial consumption.
09D Water used under this right if discharged into a natural channel shall meet Idaho Water Quality Standards.
004 The issuance of this right does not grant any right-of-way or easement across the land of another.
162 Power generation is at the Pigeon Cove Power Plant.
Dates
  • Licensed Date :
  • Decreed Date : 8/6/2009
  • Permit Proof Due Date : 8/1/1987
  • Permit Proof Made Date : 10/3/1985
  • Permit Approved Date : 8/16/1982
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date: 8/12/1980
  • Protest Deadline Date:
Other Information
  • State or Federal : S
  • Water District Number : TBD
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False