Priority Date : 6/30/1985
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
12S
22E
11
0
SW
SW
NE
CASSIA
GROUND WATER
12S
22E
12
0
SW
SW
NW
CASSIA
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
03/15
11/15
0.08 CFS
TOTAL
0.08 CFS
Places of Use
Place of Use Legal Description : IRRIGATION (CASSIA county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
12S
22E
2
NE
SE
5.0
12S
22E
2
SE
SE
24.0
12S
22E
11
NE
NE
33.0
12S
22E
11
NW
NE
33.0
12S
22E
11
SW
NE
31.0
12S
22E
11
SE
NE
32.0
Irrigation Totals
Total Acres
Acre Limit
158.00
5.00
Conditions
Code
Condtions
X27
This right is limited to the irrigation of 5 acres within the authorized place of use in a single irrigation season.
K04
This right is an expansion of Right No. 45-2600B pursuant to Section 42-1416B, Idaho Code.
X35
Rights 45-2600B and 45-13470 when combined shall not exceed a total diversion rate of 2.54 cfs, a total annual maximum diversion volume of 612 af at the field headgate, and the irrigation of 158 acres.
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No.140.
214
Prior to the diversion and use of water under Transfer approval 78302, the right holder shall install and maintain acceptable measuring device(s) at the authorized point(s) of diversion in accordance with Department specifications, or shall obtain an approved variance from the Department to determine the amount of water diverted from power records or to maintain an existing measuring device.
213
Upon specific notification of the Department, the right holder shall install and maintain data loggers to record water usage information at the authorized point(s) of diversion in accordance with Department specifications.
C18
This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.