C/O OFFICE OF GENERAL COUNSEL
A-357 ASB
PO BOX 21333
PROVO
UT
84602-1333
Water Right Status
Priority Date : 11/27/1957
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
13S
26E
12
0
SW
SW
NW
CASSIA
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
03/15
11/15
0.07 CFS
34.10 AFA
TOTAL
0.07 CFS
34.10 AFA
Places of Use
Place of Use Legal Description : IRRIGATION (CASSIA county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
13S
26E
11
SE
NE
10.0
13S
26E
12
SW
NW
2.0
Irrigation Totals
Total Acres
Acre Limit
12.00
Conditions
Code
Condtions
X35
Rights 43-13184 and 43-13186 when combined shall not exceed a total annual maximum diversion volume of 48.0 af at the field headgate, and the irrigation of 12.0 acres.
A portion of Right 43-13184 described as 0.68 cfs, 113.0 acres and 331.8 afa, has been forfeited through a period of five (5) or more years of non-use.
01M
After specific notification by the Department, the right holder shall install a suitable measuring device or shall enter into an agreement with the Department to determine the amount of water diverted from power records and shall annually report the information to the Department.
R64
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 4.0 afa per acre at the field headgate for irrigation of the lands above.
T07
The right holder shall accomplish the change authorized by this transfer within one (1) year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.