Priority Date : 2/8/1982
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
02N
18E
35
8
SW
SE
BLAINE
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/01
11/01
0.03 CFS
7.00 AFA
TOTAL
0.03 CFS
7.00 AFA
Places of Use
Place of Use Legal Description : IRRIGATION (BLAINE county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
02N
18E
35
8
SW
SE
2.0
Irrigation Totals
Total Acres
Acre Limit
2.00
Conditions
Code
Condtions
Rights 37-578E, 37-686C, and 37-8001C when combined shall not exceed a total diversion rate of 0.06cfs, a total annual maximum diversion volume of 7 af, and the irrigation of 2 acres.
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No.37.
R43
The right holder shall maintain a measuring device and lockable controlling works of a type approved by the Department in a manner that will provide the watermaster suitable control of the diversion.
046
Right holder shall comply with the drilling permit requirements of Section 42-235, Idaho Code and applicable Well Construction Rules of the Department.
R67
This right when combined with all other rights shall provide no more than 0.03 cfs per acre nor more than 3.5 afa per acre at the field headgate for irrigation of the lands above.
X61
The period of use for the irrigation described in this approval may be extended to a beginning date of 4/15 and an ending date of 10/31 provided that beneficial use of the water can be shown and other elements of the right are not exceeded. The use of water before 4/1 and after 11/01 is subordinate to all water rights having no subordinated early or late irrigation use and a priority date earlier than <the date of this approval> <or originating approval/SRBA partial decree date>.
T07
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.