Priority Date : 6/1/1884
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
BIG WOOD RIVER
MALAD RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
BIG WOOD RIVER
01S
18E
2
2
SW
SW
NE
BLAINE
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/15
10/31
3.60 CFS
TOTAL
3.60 CFS
Places of Use
Place of Use Legal Description : IRRIGATION (BLAINE county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
01S
18E
4
NE
SE
37.0
01S
18E
4
NW
SE
27.0
01S
18E
4
SW
SE
20.0
01S
18E
4
SE
SE
40.0
01S
18E
9
NE
NE
40.0
01S
18E
9
SE
NE
4.5
01S
18E
9
SE
NW
4.8
01S
18E
9
NE
SW
37.0
01S
18E
9
SE
SW
41.0
01S
18E
9
NE
SE
23.0
01S
18E
9
NW
SE
9.6
01S
18E
9
SW
SE
35.0
01S
18E
9
SE
SE
31.0
01S
18E
10
NE
NE
4.9
01S
18E
10
NW
NE
3.7
01S
18E
10
NW
NW
5.7
01S
18E
10
SW
NW
15.0
Irrigation Totals
Total Acres
Acre Limit
379.20
171.00
Conditions
Code
Condtions
Right Nos. 37-663 and 37-1231 are limited to the irrigation of a combined total of 171 acres in a single irrigation season.
Right Nos. 37- 51, 37-663, 37-1231 and 37-22329 are limited to the irrigation of a combined total of 379.2 acres in a single irrigation season.
C18
This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
Right Nos. 37- 51, 37-663 and 37-1231 are limited to the irrigation of a combined total of 265.7 acres in a single irrigation season.
K01