Priority Date : 6/1/1899
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
CAMAS CREEK
BIG WOOD RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
CAMAS CREEK
01S
14E
36
0
NW
SW
NE
CAMAS
CAMAS CREEK
01S
15E
31
0
SE
NW
NE
CAMAS
CAMAS CREEK
01S
15E
32
0
NE
NE
CAMAS
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/15
10/31
0.50 CFS
TOTAL
0.50 CFS
Places of Use
Place of Use Legal Description : IRRIGATION (CAMAS county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
01S
15E
29
NE
SE
38.0
01S
15E
29
SW
SE
40.0
01S
15E
29
SE
SE
39.0
01S
15E
32
NE
NE
22.0
01S
15E
32
NW
NE
31.0
Irrigation Totals
Total Acres
Acre Limit
170.00
80.00
Conditions
Code
Condtions
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 37B.
X27
This right is limited to the irrigation of 80 acres within the authorized place of use in a single irrigation season.
X35
Rights 37-591A, 37-592A, 37-21363 and 37-21367 when combined shall not exceed a total diversion rate of 3.28 cfs and the irrigation of 170 acres.
R43
The right holder shall maintain a measuring device and lockable controlling works of a type approved by the Department in a manner that will provide the watermaster suitable control of the diversion(s).
R63
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 3.5 afa per acre at the field headgate for irrigation of the place of use.
T07
The right holder shall accomplish the change authorized by this transfer within five year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.