Priority Date : 3/24/1883
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
BIG WOOD RIVER
MALAD RIVER
GROUND WATER
BIG WOOD RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
BIG WOOD RIVER
03N
18E
20
0
NE
SE
SW
BLAINE
GROUND WATER
03N
18E
29
0
NE
SW
BLAINE
BIG WOOD RIVER
03N
18E
29
0
SE
NE
SW
BLAINE
GROUND WATER
03N
18E
29
0
SE
SW
BLAINE
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/15
10/31
0.02 CFS
TOTAL
0.02 CFS
Places of Use
Place of Use Legal Description : IRRIGATION (BLAINE county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
03N
18E
29
NE
SW
2.6
Irrigation Totals
Total Acres
Acre Limit
2.60
Conditions
Code
Condtions
046
Right holder shall comply with the drilling permit requirements of Section 42-235, Idaho Code and applicable Well Construction Rules of the Department.
The new groundwater diversions located within the NESW and SESW of Section 29, Township 03 North, Range 18 East authorized by this transfer shall be the same groundwater diversions authorized by previously approved transfer # 79235 and shall be located within 300 feet of the Big Wood River.
If surface water is being diverted to satisfy this water right, it shall be measured at the point of diversion from the Purdum Slough in Twp 03N, Rge 18E, Sec 29, SENESW.
Rights 37-577CA, 37-659A and 37-7017 when combined shall provide no more than 0.02 cfs per acre nor more than 3.5 afa at the field headgate and shall not exceed the irrigation of 2.6 acres.
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No.37.
R43
The right holder shall maintain a measuring device and lockable controlling works of a type approved by the Department in a manner that will provide the watermaster suitable control of the diversions.
X53
Diversion of groundwater is limited to those times water is available for diversion under this right and priority from the Big Wood River.
X60
Place of use is located within Lot 1A, Blk 2, Zinc Spur Ranch Subdivision #4.
T07
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.