Priority Date : 5/1/1886
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
BIG WOOD RIVER
MALAD RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
BIG WOOD RIVER
02N
18E
36
0
SW
NW
BLAINE
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/15
10/31
2.96 CFS
126.00 AFA
TOTAL
2.96 CFS
126.00 AFA
Places of Use
Place of Use Legal Description : IRRIGATION (BLAINE county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
01N
18E
25
NW
SE
18.0
01N
18E
25
SW
SE
18.0
Irrigation Totals
Total Acres
Acre Limit
36.00
Conditions
Code
Condtions
C18
This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T07
The right holder shall accomplish the change authorized by this transfer within one (1) year of the date of this approval.
R59
This right when combined with all other rights shall provide no more than 3.5 afa per acre at the field headgate for irrigation of the lands above.
Approval of Transfer 4909 does not grant any right-of-way or easement for use of a delivery system owned by person(s) other than the right owner.
The right holder shall maintain a measuring device and lockable controlling works of a type approved by the Department at both the diversion from the river and the rediversion from the canal that will provide suitable control of the diversions.
Use of water under this water right will be regulated by the watermaster of State Water District No. 37, Big Wood River, and subject to the policies and procedures of Wood River Valley Irrigation District #45.
The portion of Right 37-23256 used for conveyance losses is 2.16 cfs. The remaining 0.08 cfs of Right 37-23256 is the authorized diversion at the field headgate.
S38
The use of water for irrigation under this right may begin as early as April 1 and may continue to as late as November 1, provided other elements of the right are not exceeded. The use of water before April 15 and after October 15 under this remark is subordinate to all water rights having no subordinated early or late irrigation use and a priority date earlier than the date a partial decree is entered for this right.
Property also known as Lot 4, Cattle-Lack Ranch Subdivision.