Priority Date : 5/1/1883
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
BIG WOOD RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
02N
18E
5
0
SE
NE
SE
BLAINE
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/15
10/31
0.19 CFS
TOTAL
0.19 CFS
Places of Use
Place of Use Legal Description : IRRIGATION (BLAINE county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
02N
18E
4
NW
SW
0.3
02N
18E
5
NE
SE
3.4
02N
18E
5
SE
SE
0.6
Irrigation Totals
Total Acres
Acre Limit
4.30
4.20
Conditions
Code
Condtions
X27
This right is limited to the irrigation of 4.2 acres within the authorized place of use in a single irrigation season.
X53
Diversion of groundwater is limited to those times water is available for diversion under this right and priority from the Big Wood River.
R67
This right when combined with all other rights shall provide no more than 0.03 cfs per acre nor more than 3.5 afa per acre at the field headgate for irrigation of the place of use.
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 37.
R43
The right holder shall maintain a measuring device and lockable controlling works of a type approved by the Department in a manner that will provide the watermaster suitable control of the diversion.
J01
Property is also known as Lot 12, River Grove Subdivision.
T07
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.