Priority Date : 6/23/2010
Basis : License
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
UNNAMED STREAM
COPPER CREEK
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
UNNAMED STREAM
01N
23E
21
0
NE
SE
BLAINE
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
WILDLIFE STORAGE
01/01
12/31
7.80 AFA
TOTAL
7.80 AFA
Places of Use
Place of Use Legal Description : WILDLIFE STORAGE (BLAINE county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
01N
23E
21
NE
SE
Conditions
Code
Condtions
220
The pond or reservoir established by the storage of water under this right shall not exceed a total capacity of 7.8 acre-feet.
To mitigate for the depletion of water resulting from re-filling of the ponds (total of 10.0 acre feet) constructed pursuant to right nos. 37-22543 and 37-22544, the right holder shall idle a total of 4.6 irrigable acres (3.6 acres for 37-22544 and 1.0 acre for 37-22543) under the following combined water rights: 37-2545A, 37-22467, 37-2688, 37-11950, 37-22468, 37-1156, 37-22466, 37-2715, 37-11936, 37-7072, 37-7600, and 37-22469.
If ponds need to be re-filled an equivalent number of acres shall be idled based on 2.17 acre-feet per acre idled for the volume needed for re-fill.
140
Noncompliance with any condition of this right, including the requirement for mitigation, is cause for the director to issue a notice of violation, cancel or revoke the right, or, if the right is included in a water district, request that the watermaster curtail diversion and use of water.
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 130.
R02
A lockable device subject to the approval of the Department shall be maintained on the diverting works in a manner that will provide the watermaster suitable control of the diversion.
R55
This right is for the use of trust water and is subject to review 20 years after the issuance of the permit to determine availability of water and to re-evaluate the public interest.