#895 PIONEER EXCHANGE ACCOMMODATION TITLE HOLDER LLC
1995 N STONEVIEW PL
BOISE
ID
83702-3052
Previous Owner
THE MULDOON RANCH CO LLC
C/O ARLEN CROUCH
370 E 500 N
JEROME
ID
83338
Previous Owner
ABC AGRA LLC
C/O BLAIR CROUCH
PO BOX 378
JEROME
ID
83338-0378
Previous Owner
LEGACY LAND & LIVESTOCK OF IDAHO LLC
4159 E 421 N
RIGBY
ID
83442-5516
Trustee
SCHUMACHER, GLENN A
1995 N STONEVIEW PL
BOISE
ID
83702-3052
Trustee
SCHUMACHER, LINDA J
1995 N STONEVIEW PL
BOISE
ID
83702-3052
Water Right Status
Priority Date : 8/8/1912
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
02N
21E
3
0
NW
SE
BLAINE
Rediversion
GROUND WATER
02N
21E
16
0
NE
NW
BLAINE
Rediversion
GROUND WATER
02N
21E
16
0
NW
NW
BLAINE
Rediversion
GROUND WATER
03N
21E
1
0
SW
SW
BLAINE
GROUND WATER
03N
21E
11
0
NW
SW
BLAINE
Injection
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/15
10/31
4.21 CFS
TOTAL
4.21 CFS
Places of Use
Place of Use Legal Description : IRRIGATION (BLAINE county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
02N
21E
9
SE
NE
8.3
02N
21E
10
NE
NW
23.0
02N
21E
10
NW
NW
12.0
02N
21E
10
SW
NW
31.0
02N
21E
10
SE
NW
2.8
02N
21E
16
NW
NW
4.1
02N
21E
16
SW
NW
9.4
02N
21E
17
SW
NE
33.0
02N
21E
17
SE
NE
31.0
02N
21E
17
SE
NW
4.9
02N
21E
17
NE
SW
32.0
02N
21E
17
SW
SW
1.6
02N
21E
17
SE
SW
35.0
02N
21E
17
NE
SE
40.0
02N
21E
17
NW
SE
31.0
02N
21E
17
SW
SE
40.0
02N
21E
17
SE
SE
25.0
02N
21E
20
NW
NE
9.9
02N
21E
20
NE
NW
23.0
02N
21E
20
NW
NW
12.0
Irrigation Totals
Total Acres
Acre Limit
409.00
210.60
Conditions
Code
Condtions
E56
The rights listed below are limited to the irrigation of a combined total of 409 acres in a single irrigation season. Combined Right Nos.: 37-1046C, 37-1142, and 37-2243A.
K06
This right is limited to the irrigation of 210.6 acres within the place of use described above in a single irrigation season.
C18
This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
C03
Right includes accomplished change in point of diversion pursuant to Section 42-1425, Idaho Code.
C05
Right includes accomplished change in place of use pursuant to Section 42-1425, Idaho Code.
G02
Point of injection into Copper Creek. Points of rediversion from Muldoon Creek.
G25
The source of this right is ground water flowing from the Mutual Mine Tunnel.