Priority Date : 10/25/1978
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
01N
18E
2
0
SW
NE
BLAINE
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/01
11/01
0.06 CFS
11.50 AFA
TOTAL
0.06 CFS
11.50 AFA
Places of Use
Place of Use Legal Description : IRRIGATION (BLAINE county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
01N
18E
2
SW
NE
3.3
Irrigation Totals
Total Acres
Acre Limit
3.30
Conditions
Code
Condtions
046
Right holder shall comply with the drilling permit requirements of Section 42-235, Idaho Code.
J01
Place of use is also known as Lot 1, Fox Hollow Subdivision.
R19
The right holder shall maintain a totalizing measuring device of a type approved by the Department as a part of the diverting works.
C18
This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
T02
The Director maintains jurisdiction over this transfer up to five (5) years after resumption of use of the water right for the purpose of determining potential injury to existing rights, both junior and senior, in the vicinity of the transferred point of diversion.
R63
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 3.5 afa per acre at the field headgate for irrigation purposes.
01M
After specific notification by the Department, the right holder shall install a suitable measuring device or shall enter into an agreement with the Department to determine the amount of water diverted from power records and shall annually report the information to the Department.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.