Priority Date : 8/9/1912
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
02N
18E
35
0
NE
NE
SE
BLAINE
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/15
10/31
0.12 CFS
21.00 AFA
TOTAL
0.12 CFS
21.00 AFA
Places of Use
Place of Use Legal Description : IRRIGATION (BLAINE county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
02N
18E
35
NE
SE
6.5
02N
18E
36
NW
SW
0.3
Irrigation Totals
Total Acres
Acre Limit
6.80
6.10
Conditions
Code
Condtions
X27
This right is limited to the irrigation of 6.1 acres within the authorized place of use in a single irrigation season.
X35
Rights 37-22212 and 37-22244 when combined shall not exceed a total diversion rate of 0.15 cfs, a total annual maximum diversion volume of 3.5 af/acre/annum at the field headgate, and the irrigation of 6.1 acres.
065
The right holder shall make full beneficial use of all surface water rights available to the right holder for irrigation of the lands authorized to be irrigated under this right. The right holder shall limit the diversion of ground water under this right to those times when the surface water supply is not available or the surface water supply is not reasonably sufficient to irrigate the place of use authorized under this right.
067
The right holder shall record the quantity of water diverted and annually report diversions of water and/or other pertinent hydrologic and system information as required by Section 42-701, Idaho Code.
T07
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.