Priority Date : 6/1/1883
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
CROY CREEK
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
02N
17E
36
0
NW
NE
BLAINE
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/15
10/31
0.20 CFS
TOTAL
0.20 CFS
Places of Use
Place of Use Legal Description : IRRIGATION (BLAINE county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
02N
17E
25
SW
SE
8.9
02N
17E
36
NW
NE
0.5
Irrigation Totals
Total Acres
Acre Limit
9.40
Conditions
Code
Condtions
The new groundwater diversion authorized by approval of this transfer (# 89619) shall be located within 10 feet of Croy Creek and shall not exceed a maximum depth of 18 feet below the land surface.
X53
Diversion of groundwater is limited to those times water is available for diversion under this right and priority from Croy Creek.
X35
Rights 37-22066, 37-22068 and 37-22070 when combined shall not exceed the irrigation of 9.4 acres.
R05
Use of water under this right may be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 37.
R43
The right holder shall maintain a measuring device and lockable controlling works of a type approved by the Department in a manner that will provide the watermaster suitable control of the diversion(s).
225
Any transfer of the point of diversion described under this right will require the right holder to provide evidence that the new point of diversion has a direct and immediate hydraulic connection to Croy Creek.
T07
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T19
Pursuant to Idaho Code § 42-1412(6), this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as determined by the Snake River Basin Adjudication court in the final unified decree entered 08/26/2014.