| Code |
Condtions |
|
Rights 36-07337K and 36-10804 when combined shall not exceed a total diversion rate of 1.30 cfs, and a total annual maximum diversion volume of 195.0 af for use at the dairy. |
| WB4 |
The total instantaneous diversion of water from all points of diversion under Rights 36-7337K and 36-10804 shall not exceed 1.30 cfs, nor a total combined annual volume of 196.2 af. |
|
Commercial use is for a dairy located in the NW, S14, T08S, R15E. |
| 131 |
Prior to the diversion and use of water under Transfer approval 71491, the right holder shall install and maintain acceptable measuring device(s), including data logger(s), at the authorized point(s) of diversion and in accordance with Department specifications, or shall obtain an approved variance from the Department to determine the amount of water diverted from power records or to maintain an existing measuring device. |
| T18 |
Prior to diversion of water under this approval, the right holder shall provide a lockable controlling works for all authorized points of diversion. The controlling works must be suitable for control of the diversions and acceptable to the watermaster. |
| R05 |
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 130. |
| 067 |
The right holder shall measure and annually report diversions of water and/or other pertinent hydrologic and system information as required by Section 42-701, Idaho Code. |
| 082 |
The dairy operation authorized under this approval shall comply with applicable county zoning and use ordinances. |
| 106 |
Prior to the diversion and use of water under this approval, the right holder shall comply with applicable water quality standards of the Department of Environmental Quality. |
| 046 |
Right holder shall comply with the drilling permit requirements of Section 42-235, Idaho Code and applicable Well Construction Rules of the Department. |
| T07 |
The right holder shall accomplish the change authorized by this transfer within one (1) year of the date of this approval. |
| T08 |
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer. |
| T19 |
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree. |